1Reading P&IDs
Symbols and tags for valves, pumps and instruments on a piping diagram.
2Easy definition, and a picture to remember
A P&ID (piping and instrumentation diagram) is the map of a process: every pipe, valve, pump, vessel and instrument, each with a symbol and a tag. A tag such as FIC-101 is a code: the letters say what and how, the number says which loop.
Imagine it
Read it like a street map. Roads are pipes, junctions are valves, and the small labelled circles are the people who watch the traffic and wave the flags. Once you know the symbols, you can follow the flow from tank to tank and see who is controlling what.
Memory hook
Follow the solid lines for the fluid and the dashed lines for the signals. Read a tag left to right: what is measured, what the device does, which loop.
3What decides it, and how
Three things to read on every P&ID.
Symbols
Each shape is a type of equipment. A bow tie is a valve, a circle with a triangle is a pump.
Ten symbols let you read most diagrams.
valve ▷◁ · pump ◯
Lines
Solid lines carry the fluid. Dashed lines carry signals in this simple diagram. Real P&ID legends use different line styles for electrical, pneumatic and data signals.
A signal line shows which instrument talks to which valve.
—— process · - - - signal
Tags
The letters say what is measured and what the device does. The number groups devices into a loop.
FT-101 is the flow transmitter and FV-101 the flow valve of the same loop.
first letter + function + loop number
Try it: click a symbol, change the setpoint and watch the loop respond
In the tag FT-101, what does the second letter T mean?
Click any symbol to learn what it is.
Control valve
FV-101The final control element: it opens and closes to change the flow. It takes the 4–20 mA signal from FIC-101 and is moved by an actuator.
A bow-tie valve with a dome on top. The dome is a diaphragm actuator.
Decode a tag
FIC-101
Flow Indicating Controller · loop 101
5Units and formulas
Tags follow ISA 5.1. The first letter is the measured variable (F flow, L level, P pressure, T temperature). Later letters are functions (I indicate, T transmit, C control, V valve, S switch, A alarm, E element). A control loop shares one number across all its devices.
Formulas
- FIC-101 = Flow + Indicating Controller, loop 101
- FT-101 = Flow + Transmitter, loop 101
- FV-101 = Flow + control Valve, loop 101
- 4–20 mA = 0–100% of the measured range
6Why it matters, and common mistakes
Why it matters
- ✓Every project, commissioning and maintenance job starts from the P&ID.
- ✓It shows which valve controls which flow, and what protects what.
- ✓Reading it lets you find the right valve, instrument or tag without a guide.
Common mistakes
- !Treating it as a layout drawing: it shows how things connect, not where they stand.
- !Mixing up the second letter: the T in FT is Transmitter, not Temperature.
- !Skipping the legend sheet: companies draw some symbols their own way.
Keep going: more essentials
Kv and Cv
How valve capacity is expressed, and how to convert between Kv and Cv.
Open lesson →
Pipe sizes and pressure classes
DN, PN, flange ratings and end connections made simple.
Open lesson →
Cavitation
Why liquids form bubbles through a valve, and how that damages equipment.
Open lesson →
Water hammer
Pressure surges from fast valve closure, and how to avoid them.
Open lesson →
Torque
The twisting force that turns a valve stem, a bolt or a shaft.
Open lesson →